7.1 SOLAR SYSTEM
One hotwater storage tank 100ltr.
Two solar collectors SC-85
Pos. |
Article |
Qty. |
Rate |
Amount |
|
Summary material | | | |
1-8 |
Material cost for hot water storage tank 100 Itr. net |
1 | | |
10-13 |
Material cost for two solar collectors SC-85 and accessories, net |
2 | | |
| | | | |
|
Sub total |
| | |
|
| | |
|
|
Summary working hrs., labour charge | |
| |
| |
| | |
1-8 |
Hotwater storage tank 100 Itr. working hrs., and labour cost |
163 hrs. | |
|
| | | | |
10-13 |
Two solar collector SC-85 and accessories | |
| |
|
Working hrs., and labour cost |
173 hrs. | |
|
| | | | |
|
Sub total |
| | |
|
Overhead on material % | | | |
|
Overhead on labour charge % | | | |
|
Transportation charge | | | |
| | | | |
1-13 |
Total cost of one solar system one hotwater storage tank 100 Itr. two solar collectros SC-85 |
| | |
7.2 HOTWATER STORAGE TANK 100 LTR.
Pos. |
Article |
|
Qty. |
Rate |
Amount |
1 |
MS-tank 100 ltr. (inside) | | | | |
1.1 |
Cylinder MS-sheet 3 mm | | | | |
|
1277 x 800 mm |
| | |
|
|
1.021 m²+ 10%* |
|
1.23 m² |
| |
1.2 |
Disk up/down MS-sheet 3 mm | | | | |
|
400 x 400 mm |
| | |
|
|
0.16 m² + 10% = 1.76 m² x 2 | |
0.352 m² |
| |
1.3 |
G.l. pipe (vent) |
1/2" |
0.1 m | |
|
1.4 |
G.l. hexagon nuts |
1/2" |
2 pcs. | |
|
1.5 |
G.l. socket |
1/2" |
1 pc. | |
|
1.6 |
G.l. cap |
1/2" |
1 pc. | |
|
1.7 |
Red. Socket |
1 /2" -3/8" |
1 pc. | |
|
1.8 |
Welding rods 0 3 mm |
|
40 pcs. | |
|
1.9 |
Tar-paint (2-coats) |
|
1.2 Itr. | |
|
1.10 |
Cement (inside lining, corrosion production) | |
5 kg | | |
1.11 |
Electric charge |
| | |
|
1.12 |
Tool and machine charge | | | | |
1 |
Material cost for MS-tank 100 ltr. net | | | | |
1 |
Working hrs. and Labour charge for | |
| | |
|
cutting, rolling, welding, pressure | |
| | |
|
testing, painting and cement coating | |
24 hrs. | |
|
| | | | | |
2 |
Flange with water and solar connection | | | | |
2.1 |
Flangeringg MS |
10 mm | |
| |
|
outside Ø 220, inside Ø 155 | |
4.25 kg | |
|
2.2 |
Flange MS 10 mm |
Ø220 mm |
4.25 kg | |
|
2.3 |
Flange pipe MS-sheet 3 mm | | | | |
|
471 x 90 mm = 0.042 m² + 10% | |
0.046 m² |
| |
2.4 |
G.l. pipe (hot water) |
3/4" |
0.2 m | |
|
2.5 |
G.l. pipe (hot water) |
3/4" |
0.712 m | |
|
2.6 |
G.l. pipe (cold water) |
3/4" |
0.1 m | |
|
2.7 |
G.l. pipe (solar inlet warm) |
1 " |
0.53 m | |
|
2.8 |
G.l. pipe (solar outlet cold) |
1 " |
0.1 m | |
|
2.9 |
Baffle plate G.l. sheet 18 gauge | | | | |
|
60 x 70 mm | |
0.0046 m² |
| |
2.10 |
G.I. elbows |
3/4" |
2 pcs. | |
|
2.11 |
G .I. elbows |
1 " |
2 pcs. | |
|
2.12 |
G.I. unions |
3/4" |
2 pcs. | |
|
2.13 |
G.I. unions |
1 " |
2 pcs. | |
|
2.14 |
Nipple 2 x 120 mm |
3/4" |
0.24 m | |
|
2.15 |
Nipple 2 x 100 mm |
1 " |
0.2 m | |
|
2.16 |
G.I. socket |
3/4" |
1 pc. | |
|
2.17 |
Steam packing washers for union |
¾ |
2 pcs. | |
|
2.18 |
Steam packing washers for union |
1" |
2 pcs. | |
|
2.19 |
Steam packing washer 3 mm | | | | |
|
Ø 180 outside, Ø 145 inside | | | | |
|
Ø 180 mm² = 0.032 m² + 10% | |
0.035 m² |
| |
2.20 |
Hexagon screws, galv. |
M8 x 40 |
12 pcs. | |
|
2.21 |
Hexagon nuts, galv. |
M8 |
12 pcs. | |
|
2.22 |
Threaded rod, galv. L= 100 mm |
M8 |
1 pc. | |
|
2.23 |
Washers, galv. |
M8 |
12 pcs. | |
|
2.24 |
Red oxyde paint |
|
0.1 ltr. | |
|
2.25 |
Welding rods 0 3 mm |
5 pcs. | |
| |
2.26 |
Electric charge |
| | |
|
2.27 |
Tool and machine charge | | | | |
2.28 |
Oxygen and gas |
| | |
|
| | |
| | |
2 |
Material cost for flange with water and solar connection, net | | | | |
2 |
Working furs. and labour charge for gas cutting, filing, drilling, preparation of pipes, welding and assembling | |
32 hrs. | |
|
3 |
Side flange for thermostat and electro heating element | | | | |
3.1 |
Flangeringg MS 10 mm |
| | |
|
|
Ø 220 outside, 0 155 mm inside | |
4.25 kg | |
|
3.2 |
Flange, MS 10 mm 0 220 mm | |
4.25 kg | |
|
3.3 |
Flange pipe, MS-sheet 3 mm | | | | |
|
0 150 mm, length 90 mm | | | | |
|
471 x 115 mm |
| | |
|
|
0.054 m² + 10% |
|
0.059 m² |
| |
3.4 |
G.l. pipe |
1½ '' |
0.42 m | |
|
3.5 |
Disk MS-sheet 3 mm |
| | |
|
|
48 x 48 mm | |
0.002 m² |
| |
3.6 |
MS-pipe |
1/4" |
0.42 m | |
|
3.7 |
Connectorr sheet 2 mm | | | | |
|
60 x 40 mm | |
0.0024 m² |
| |
3.8 |
Electro element holder 2 mm | | | | |
|
58 x 10 mm | |
0.0006 m² |
| |
3.9 |
Slotted pan head screw |
M6 x 5 |
1 pc. | |
|
3.10 |
Steam packing washer 3 mm | | | | |
|
Ø 180 outside, 0 145 inside | | | | |
|
Ø 180 mm² = 0.034 m² + 10% | |
0.038 m² |
| |
3.11 |
Threaded rod + nut |
M8 x 100 |
1 | | |
3.12 |
Hexagon screws, galv. |
M8 x 40 |
12 pcs. | |
|
3.13 |
Hexagon nuts, galv. |
M8 |
12 pcs. | |
|
3.14 |
Washers, galv. |
M8 |
12 pcs. | |
|
3.15 |
Welding rod Ø 3 mm |
|
5 pcs. | |
|
3.16 |
Electric charge |
| | |
|
3.17 |
Tool and machine charge | | | | |
3.18 |
Oxygen and gas |
| | |
|
3.19 |
Red oxyde paint |
|
0.1 ltr. | |
|
| | | | | |
3 |
Material cost for one side flange for thermostat and electro | | | | |
|
heating element, net |
| | |
|
3 |
Working furs. and labour charge for gas cutting, filing, drilling, | | |
| |
|
preparation of pipes, welding and assembling | |
24 hrs. | |
|
4 |
Insulationn 100 mm (for tank 100 ltr.) | |
| | |
4.1 |
Fibreglasss insulation 50 mm | | | | |
|
First layer |
| | |
|
|
1550 x 800 | |
1.24 m² |
| |
4.2 |
Second layer |
| | |
|
|
1900 x 800 | |
1.52 m² |
| |
4.3 |
Top and bottom |
| | |
|
|
600 x 600 = 0.36 m² x 4 | |
1.44 m² |
| |
4.4 |
Pe-bag 1900 x 1000 mm | |
1 | | |
4 |
Material cost for insulation 100 mm thick for one 100 ltr. hotwater storage tank, net | |
| | |
4 |
Working furs. and labour charge for | |
| | |
|
cutting, fixing of the insulation | |
8 hrs. | |
|
| | | | | |
5 |
Outside cover, (for tank 100 ltr.) | | | | |
5.1 |
Alu. cover up, prefabricated | | | | |
|
Ø 600 mm. | |
1 pc. | |
|
5.2 |
Alu. cover down, prefabricated | | | | |
|
Ø 600 mm | |
1 pc. | |
|
5.3 |
Alu. cover for side flange | | | | |
|
(250 mm), prefabricated Ø 10" | |
1 pc. | |
|
5.4 |
Alu. cover for bottom flange | | | | |
|
(230 mm), prefabricated 0 9" | |
1 pc. | |
|
5.5 |
Washers, galv. |
M8 |
2 pcs. | |
|
5.6 |
Hexagon nuts |
M8 |
2 pcs. | |
|
5.7 |
G.l. sheet, cylinder 24 gauge | | | | |
|
1903 x 780 mm |
| | |
|
|
1.48 m² + 10% |
|
1.59 m² |
| |
5.8 |
Cover belts, G.l. sheet 24 gauge | | | | |
|
(2 pieces) | |
| | |
|
50 x 1910 mm |
| | |
|
|
0.095 m² + 10% = 0.1 x 2 | |
0.2 m² |
| |
5.9 |
Screw plates, 4 pieces | | | | |
|
size: 50x20 x 3 mm |
| | |
|
|
MS-flat 0.08 m (1.8 kg/m) | |
0.094 kg | |
|
5.10 |
Hexagon screws, galv. |
M8 x 25 |
4 pcs. | |
|
5.11 |
Hexagon nuts, galv. |
M8 |
4 pcs. | |
|
5.12 |
Washers, galv. |
M8 |
4 pcs. | |
|
5.13 |
Nameplate alu. |
190 x 70 mm |
1 pc. | |
|
5.14 |
Soldering mat. Tin |
40/60 |
0.05 kg | |
|
5.15 |
Pop rivets alu. |
Ø 3 |
30 pcs. | |
|
5.16 |
G. I. sheet watershild 20 gauge | | | | |
|
400 x 40 mm |
| | |
|
|
0.016 + 10% |
|
0.017 m² |
| |
5.17 |
Red oxide paint |
|
1.5 ltr. | |
|
5.18 |
White paint,enamel |
|
1.0 ltr | |
|
5.19 |
Blue paint,enamel |
|
0.2 ltr | |
|
5.20 |
Thiner | |
1.0 ltr | |
|
5.21 |
Tool and machine charge | | | | |
5.22 |
Electric charge/gas |
| | |
|
| | |
| | |
5 |
Material cost for G. l. outside | | | | |
|
cover for one hotwater storage | | | | |
|
tank 100 ltr., net |
| | |
|
5 |
Working furs. and labour charge for | |
| | |
|
cutting, of alu. covers and G.l. | | | | |
|
sheets, folding, bending, | | | | |
|
assembling and painting | |
35 hrs. | |
|
| | | | | |
6 |
Electric heating/thermostat | | | | |
6.1 |
Heating element removable | | | | |
|
L = 280 mm, Ø 37 mm, 230 V | |
1 pc. | |
|
6.2 |
Thermostaat, L = 280 mm, Ø 8 mm | | | | |
|
230 V, 20 A |
| | |
|
|
range 30 -80°C |
|
1 pc. | |
|
6.3 |
Connectorr | |
1 pc. | |
|
6.4 |
Control lamp |
|
1 pc. | |
|
6.5 |
Wiring | |
1 | | |
6.6 |
Cable shoes |
|
3 pcs. | |
|
6.7 |
Slotted pan head screws |
M4 x 20 |
3 pcs. | |
|
| | | | | |
6 |
Material coast for electro | | | | |
|
heating/thermostat ,net | | | | |
6 |
Working furs. and labour charge for | |
| | |
|
fixing of heating element, thermostat, | |
| | |
|
wiring and testing |
|
5 hrs. | |
|
| | | | | |
7 |
Boiler stand SE 100 ltr. | | | | |
7.1 |
Belt for boiler stand, MS 3 mm | | | | |
|
1305 x 115 mm |
| | |
|
|
0.15 m² + 10% |
|
0.165 m² |
| |
7.2 |
G.l. pipe, support legs (3 pcs.) 1" | |
| | |
|
length 1000 mm x 3 |
|
3 m | | |
7.3 |
G.l. pipe, support nipples | | | | |
|
(3 pcs.) 1 " |
| | |
|
|
length 250 mm x 3 |
|
0.75 m | |
|
7.4 |
Baseplate MS-sheet |
|
5 mm | | |
|
100 x 100 mm |
| | |
|
|
0.01 m²+ 10% |
0.011 m² |
| | |
7.5 |
Gl-socketss |
1" |
3 pcs. | |
|
7.6 |
Hexagon screws, galv. |
M10 x 50mm |
2 pcs | |
|
7.7 |
Hexagon nuts, galv. |
M10 |
2 pcs. | |
|
7.8 |
Washers, galv |
M10 |
2 pcs | |
|
7.9 |
Welding rods Ø 3 mm |
|
3 pcs | |
|
7.10 |
Red oxyde paint |
|
0.3 ltr. | |
|
7.11 |
Electric charge |
| | |
|
7.12 |
Tool and machine charge | | | | |
| | | | | |
7 |
Material cost for one boiler | | | | |
|
stand, net | |
| | |
7 |
Working furs. and labour charge for | |
| | |
|
cutting, drilling, rolling, thread | | | | |
|
cutting, welding, painting, and assembling | |
14 hrs. | |
|
8 |
Wall-hangeers 100 ltr. | | | | |
8.1 |
Belt for boiler wall-hangers | | | | |
|
MS 3 mm (2 pcs.) |
| | |
|
|
1305 x 115 mm |
| | |
|
|
0.15 ²2 + 10% x 2 | |
0.33 m² |
| |
8.2 |
Insulatingg strip, tarfelt | | | | |
|
1265 x 115 mm (up only) | |
0.145 m² |
| |
8.3 |
Reinforceement up, MS-sheet 3 mm | | | | |
|
95 x 55 mm (2 pcs.) |
| | |
|
|
0.0052 m² + 10% x 2 | |
0.002 m² |
| |
8.4 |
Reinforceement down, MS-sheet 3 mm | | | | |
|
95 x 55 mm (2 pcs.) |
| | |
|
|
0.0052 m² + 10% x 2 | |
0.002 m² |
| |
8.5 |
Hexagon screws, galv. |
M10 x 50 mm |
4 pcs. | |
|
8.6 |
Hexagon nuts, galv. |
M10 |
4 pcs. | |
|
8.7 |
Washers, galv. |
M10 |
8 pcs. | |
|
8.8 |
Spacing sheets, MS 3 mm | | | | |
|
220 x 195 mm (2 pcs.) | | | | |
|
0.043 + 10% x 2 |
|
0.094 m² |
| |
8.9 |
Hangers, MS-flat |
| | |
|
|
410 x 50 x 5 mm (2 pcs.) | | | | |
|
L = 0.41 m (1.96 kg/m) | |
0.8 kg | |
|
8.10 |
Wall plugs, Mod. Fischer S12 | | | | |
|
(plastic dowel 0 12 mm) | |
4 pcs. | |
|
8.11 |
Square head wood screws, galv. | | | | |
|
100 x 10 mm, (4" x 3/8") | |
4 pcs. | |
|
8.12 |
Welding rods 0 3 mm |
|
3 pcs. | |
|
8.13 |
Red oxyde paint |
|
0. 3 ltr. |
| |
8.14 |
Electric charge |
| | |
|
8.15 |
Tool and machine charge | | | | |
| | | | | |
8 |
Material cost for two wall hangers | | | | |
|
net | | | | |
8 |
Working furs. and labour charge for | |
| | |
|
cutting, drilling, rolling, welding, | |
| | |
|
painting and assembling | |
21 hrs. | |
|
7.3 Hotwater storage tank 100 Itr.,SUMMARY
Pos. |
Article |
Qty. |
Rate |
Amount |
|
Summary Material | | | |
1. |
MS-tank 100 ltr. (inside) |
1 | | |
2. |
Flange with water and solar connection |
1 | | |
3. |
Side flange for thermostat and electro heating element |
1 | | |
4. |
Insulation, 100 mm (tank 100 ltr.) |
1 | | |
5. |
Outside cover (tank 100 ltr.) |
1 | | |
6. |
Electro heating/thermostat |
1 | | |
7. |
Boiler stand |
1 | | |
8. |
Wall hangers (optional to boiler stand) | |
1 | |
1-8 |
Material cost for hotwater storage tank 100 ltr. net | | | |
|
Working hrs., labour charge | | | |
1. |
MS-tank 100 ltr. (inside) |
24 hrs. | |
|
2. |
Flange with water and solar connection |
32 hrs. | |
|
3. |
Side flange for thermostat and | | | |
|
electro heating element |
24 hrs. | |
|
4. |
Insulation 100 mm (tank 100 ltr.) |
8 hrs. | |
|
5. |
Outside cover (tank 100 ltr.) |
35 hrs. | |
|
6. |
Electro heating/thermostat |
5 hrs. | |
|
7. |
Boiler stand |
14 hrs. | |
|
8. |
Wall hangers (optional to boiler stand) |
21 hrs. | |
|
1-8 |
Working hrs., labour charge total | | | |
| | | | |
|
Overhead on materials, % | | | |
|
Overhead on labour charge, % | | | |
|
Transportation charge | | | |
|
Total cost of one hotwater storage tank 100 ltr. | | | |
EXAMPLES OF COST CALCULATION
7.4 SOLAR COLLECTOR SC-85
Pos. |
Article |
|
Oty. |
Rate |
Amount |
10 |
Solar collector SC-85 | | | | |
|
Size: 1810x 790x 110 mm, | | | | |
|
effective area 1.2 m² | | | | |
|
Weight: 47 kg |
| | |
|
10.1 |
Collector box 24 gauge G. l. sheet | | | | |
|
1000 x 2000 mm |
| | |
|
|
2m² + 10%* |
|
2.2 m² |
| |
10.2 |
Frame left 24 gauge G. l. sheet | | | | |
|
1829 x 100 mm |
| | |
|
|
0.182 m² + 10% |
|
0.2 m² |
| |
10.3 |
Frame right 24 gauge G. l. sheet | | | | |
|
1829 x 100 mm |
| | |
|
|
0.182 m² + 10% |
|
0.2 m² |
| |
10.4 |
Frame top 24 gauge G. l. sheet | | | | |
|
782 x 100 mm |
| | |
|
|
0.078 m² + 10% |
|
0.086m² |
| |
10.5 |
Frame bottom |
24 gauge G. l. sheet | | | |
|
782 x 150 mm |
| | |
|
|
1.17 m² + 10% |
1.3 m² |
| | |
10.6 |
Hexagon head tapping |
| | |
|
|
screws w. metal and rubber | | | | |
|
washer 6.5 x 16 |
|
10 pcs. | |
|
10.7 |
G.l. pipes 1/2" |
| | |
|
|
length = 1668 mm, |
9 pcs. |
15.012 m | |
|
10.8 |
G.I. pipes 1 /2" |
| | |
|
|
length = 830 mm, |
2 pcs. |
1.66 m | |
|
10.9 |
Alu. fins 26 gauge Alu. sheet | | | | |
|
412 x 120 mm 36 pcs. |
| | |
|
|
1.78 m² + 10% |
|
1.95 m² |
| |
10.10 |
Cresent rings 27.7 x 21.7 mm | |
72 pcs. | |
|
10.11 |
Insulation fibreglass |
50 mm | |
| |
|
1950 x 1000 mm |
| | |
|
|
1.95 m² |
|
2 m² |
| |
10.12 |
Glass, 4 mm thick |
| | |
|
|
1800 x 772 mm |
|
1.39 m² |
| |
10.13 |
Rubberseal, |
| | |
|
|
U-channel | |
5.3 m | |
|
10.14 |
Pop-rivets copper Ø 3.2 | |
8 pcs. | |
|
10.15 |
Soldering mat. tin 40/60 | |
0.05 kg | |
|
10.16 |
Black board paint |
|
0.5 ltr. | |
|
10.17 |
Red oxyde | |
1.0 ltr. | |
|
10.18 |
Brown No. 403 or dark green No. 212 | |
| | |
|
enamel paint |
|
1.0 ltr. | |
|
10.19 |
Thinner | |
0.5 ltr. | |
|
10.20 |
Tool and machine charge | | | | |
10.21 |
Electric charge |
| | |
|
| | |
| | |
10 |
Mat. cost for one collector | | | | |
|
type SC-85, net |
| | |
|
10 |
Working hrs., and labour charge | | | | |
|
for one collector type SC-85 | | | | |
|
marking, cutting, folding, | | | | |
|
pressing, welding, soldering, | | | | |
|
testing, painting and assembling. | |
53 hrs. | |
|
| | | | | |
11 |
Support for two collectors SC-85 | | | | |
11.1 |
Hat rails, (G.l. sheets 20 gauge | | | | |
|
1926 x 152 mm (3 pcs. ) | | | | |
|
0.292 m² + 10% = 0.32 x 3 | |
1.0 m² |
| |
11.2 |
Hat rails, G.l. sheets 20 gauge | | | | |
|
1638 x,52 mm (2 pcs.) | | | | |
|
0.248 m² + 10% = 0.273 x 2 | |
0.55 m² |
| |
11.3 |
Distance pipes (6 pcs.) | | | | |
|
G.l. pipe 3/4" |
| | |
|
|
L= 60 mm x 6 |
|
0.36 m | |
|
11.4 |
Hexagon screws, galv. |
M8 x 70 |
6 pcs. | |
|
11.5 |
Hexagon nuts, galv. |
M8 |
6 pcs. | |
|
11.6 |
Washers, galv. |
M8 |
12 pcs. | |
|
11.7 |
Flat iron (2 pcs.) |
| | |
|
|
size: 50 x 150 x 5 mm | | | | |
|
MS-flat 0.3 m (1.96 kg/m) | |
0.6 kg | |
|
11.8 |
Support sheets |
3 mm | | | |
|
100 x 170 mm |
(2 pcs.) | |
| |
|
0.017 m² + 10% |
|
0.019 m² |
| |
11.9 |
Reinforcement triangle sheet, 3 mm | | | | |
|
50 x 50 mm (2 pcs.) |
| | |
|
0.25 |
m² + 10% |
|
0.0027m² |
| |
11.10 |
Hexagon screws, galv. |
M8 x 20 |
4 pcs. | |
|
11.11 |
Hexagon nuts, galv. |
M8 |
4 pcs. | |
|
11.12 |
Washers, galv. |
M8 |
4 pcs. | |
|
11.13 |
G.I. pipes |
(2 pcs.) | |
| |
|
L = 600 mm |
3/4" |
1.2 m | |
|
11.14 |
G.l. pipes |
(2 pcs.) | |
| |
|
L = 170 mm |
3/4" |
0.34 m | |
|
11.15 |
G.I. sockets |
3/4" |
2 pcs. | |
|
11.16 |
Hexagon screws, galv. |
M8 x 20 |
4 pcs. | |
|
11.17 |
Hexagon nuts, galv. |
M8 |
4 pcs. | |
|
11.18 |
Washers, galv. |
M8 |
4 pcs. | |
|
11.19 |
Red oxyde paint |
|
0.2 llr. | |
|
11.20 |
Dark brown paint |
|
0.2 ltr. | |
|
11.21 |
Tool and machine charge | | | | |
11.22 |
Electric charge |
| | |
|
| | |
| | |
11 |
Mat. cost support for two | | | | |
|
collectors SC-85 |
| | |
|
11 |
Working hrs., and labour charge | | | | |
|
support for two collectors SC-85 | | | | |
|
marking, cutting, punching, | | | | |
|
folding, thread cutting, painting | | | | |
|
and assembling |
|
42 hrs. | |
|
| | | | | |
12 |
Circulation G.l. pipes for two | | | | |
|
collectors SC-85 |
| | |
|
12.1 |
G.I. pipe 1742 mm 1 " | |
1.742 m | |
|
12.2 |
G.l. pipes(2 pcs.) |
| | |
|
|
L = 787 mm 1 " |
|
1.574 m | |
|
12.3 |
G.I.pipes (2 pcs.) |
| | |
|
|
L= 150 mm 1" |
|
0.3 m | |
|
12.4 |
G.I. pipes 58 mm 1 " |
|
0.058 | |
|
12.5 |
G.l. elbows 1 " |
|
6 pcs. | |
|
12.6 |
G.l. unions 1" |
|
2 pcs. | |
|
12.7 |
Steam packing washers for | | | | |
|
union 1" | |
2 pcs. | |
|
12.8 |
G.l. caps 1 " |
|
2 pcs. | |
|
12.9 |
Fibreglass insulation 50 mm 1.0 m² | |
| | |
|
| | |
| |
12.10 |
Red oxyde paint |
|
0.3 ltr. | |
|
| | | | | |
12.11 |
Tool and machine charge | | | | |
| | | | | |
12 |
Mat. cost circulation pipes for | | | | |
|
two collectors SC-85 |
| | |
|
12 |
Working hrs., and labour charge, | | | | |
|
circulation pipes for two | | | | |
|
collectors SC-85 |
| | |
|
|
marking, cutting, thread cutting, | | | | |
|
painting and assembling | |
14 hrs. | |
|
| | | | | |
13 |
Panels for two collectors SC-85 | | | | |
13.1 |
Middle panel 24 gauge | | | | |
|
1840 x 200 mm |
| | |
|
0.368 |
m² + 10% |
|
0.4 m² |
| |
13.2 |
Side panel 24 gauge |
| | |
|
|
1950 x 265 mm (2 pcs.) | | | | |
|
0.516 m² + 10% x 2 | |
1.14 m² |
| |
13.3 |
Top panel 24 gauge |
| | |
|
|
2018 x 265 mm |
| | |
|
|
0.534 m² + 10% |
|
0.59 m² |
| |
13.4 |
Pan head tapping screws, galv. 3.5 x 95 | |
8 pcs | |
|
13.5 |
Red oxyde paint |
|
1.0 ltr. | |
|
13.6 |
Dark brown paint. |
|
1.0 ltr. | |
|
13.7 ´ |
Tool and machine charge | | | | |
| | | | | |
13 |
Mat. cost panels for two | | | | |
|
collectors SC-85 |
| | |
|
13 |
Working hrs., and labour | | | | |
|
charge panels for two collectors | | | | |
|
marking, cutting, folding, drilling | |
| | |
|
painting, assembling |
|
11 hrs. | |
|
7.5 SOLAR COLLECTOR SC-85, SUMMARY
Pos. |
Article |
Qty. |
Rate |
Amount |
|
Summary Material | | | |
10 |
Material cost for two collectors SC-35 |
1 set | |
|
11 |
Support for two collectors SC-85 |
1 | | |
12 |
Circulation G. I. pipes for two | | | |
|
collectors SC-85 |
1 | | |
13 |
Panels for two collectors SC-35 |
1 | | |
10-13 |
Material cost for two solar collectors | |
| |
|
SC-85 and accessories, net | | | |
| | | | |
|
Working hrs., labour charge | | | |
| | | | |
| | | | |
10 |
Solar collector SC-85 | | | |
|
two pieces (2 x 53 hrs.) |
106 hrs. | |
|
11 |
Support for two collectors SC-85 |
42 hrs. | |
|
12 |
Circulation G. I. pipes for two | | | |
|
collectors SC-85 |
14 hrs. | |
|
13 |
Panels for two collectors SC-85 |
11 hrs. | |
|
10-13 |
Working hrs., labour charge total |
173 hrs. | |
|
|
Overhead on materials, % | | | |
|
Overhead on labour charge % | | | |
|
Transportation charge | | | |
|
Total cost for two solor collectors SC-85 | |
| |
|
and accessories |
| | |